Ana-Box Programming Spreadsheet
Quickly create pump programs for your Ana-Box controlled pumps using this free spreadsheet. Features: Drop-down menus of each programming function Guides you along with required parameters Generates your Ana-Box pump program ready for uploading to your pump. Ability to manage pumping programs directly on your PC Assists you with advanced level program […]
Valve Control Box Single Instructions
Valve Control Box Instructions Control a valve from your pump using a pump program and a ttl output. ADPT-VALVE-INTERFACE-1
Valve Control Box Double Instructions
Valve Control Box Instructions Control a valve from your pump using a pump program and a ttl output. ADPT-VALVE-INTERFACE-2
Syringe Heater User Manual
Syringe Heater User Manual Warm your fluids on the pump. Peristaltic and Syringe Pump versions available. HEATER-KIT-1LG and HEATER-KIT-5SP
ANA-BOX User Manual
This is the User Manual for the Ana-Box. The Ana-Box takes an analogue voltage input and uses it to control the actions of a pump connected to it. Looking for the Ana-Box Programming Spreadsheet? This will help you get started using your Ana-Box. ADPT-ANABOX-11
ADPT-FOOTSW-2 Foot Switch
Foot switch User Guide The foot switch allows an operator to trigger pumping activity via the creation of PPL pump programs. ADPT-FOOTSW-2
CBL-TTL-1 Instructions
Used for creating a continuous infusion system or dual infusion system Synchronize pumping direction of two pumps so that they change directions, start, and stop as one unit Utilizes the TTL logic port on pump – See new version above for using the RS-232 ports 7′ cable CBL-TTL-1
CBL-DUAL-3 Instructions
Used for creating a continuous infusion system, dual infusion system, or one of the other 2 pump automation modes. Establishes a communications link between two pumps using the RS-232 serial ports on the pumps. Replaces cable CBL-TTL-1, unless the use of the TTL ports for synchronization is preferred CBL-DUAL-3
CBL-NET Instructions
Allows networking of two or more pumps or other device to a single computer Quick and simple setup Utilizes the RS-232 communications port of device Available in 7′ and 25′ length cable Requires first device to be connected with primary network cable CBL-NET-7 (7 ft. cable) CBL-NET-25 (25 ft. cable)
NE-1000 Syringe Pump User Manual
Covers basic and advanced operating of the NE-1000 pump. There are detailed sections on operating the pump, programming the pump, and RS-232 commands. It may be generally used for all New Era Pump Systems Pumps in conjunction with model specific addendum sheets and model specific Rates and Specification sheets.
ANA-BOX User Manual
This is the User Manual for the Ana-Box. The Ana-Box takes an analogue voltage input and uses it to control the actions of a pump connected to it. Looking for the Ana-Box Programming Spreadsheet? This will help you get started using your Ana-Box. ADPT-ANABOX-11
NE-8000 Addendum
NE-8000 Addendum The basic features of the NE-8000 are the same as the NE-1000. This Addendum documents the extra features that an NE-8000 has compared to the NE-1000. There are some important operational differences. Limit switch No stall detection Solid nut block – cannot be released. You must use the purge function to Warning Use […]